top of page
RENOVATION - BEFORE & AFTER

A dark warren of offices,
reopened as one community room.

We kept the building's shell and its shaded approach, then took everything inside back to the slab — lifting the ceiling into the original roof structure and replacing a corridor of small rooms with a single daylit assembly hall.

Palm Beach Gardens

2026

The approach we kept

01

Approach
20250225_102252.jpg

The canopy walk and barrel-vaulted entry were the one thing the building already did well.
Everything in this story happens behind that door.

What we walked into

02

20250225_102112.jpg

Lobby — drop ceiling, carpet tile, no view through.

Existing corridor.jpg

Corridor — a long run of doors, borrowed light only.

20250415_161507.jpg

Restrooms — original laminate, floor tile, exposed trap.

Low acoustic tile, brown carpet, and a spine of private offices that pushed every window behind a wall.

Back to the frame

03

Every partition and the entire ceiling plane came out. With the roof deck exposed we found the height to work with — then framed a new vault up into it.

Demo

Demolition — partitions removed, original roof deck revealed.

Process Trusses.png

New framing — the vault that sets the room's centerline.

The finished room

04

Lit for gathering, framed for sound, and open end to end.

gathering space

Enclosed corridors and dark offices gave way to a large open space with abundant natural light.

Lobby.png

Lobby renovated with Large-format porcelain, modern fixtures and better sight lines.

DSC08289 edit.jpg

Restrooms upgraded with solid surfaces and floating vanity. 

Gathering space

Where the plan once held small rooms beneath a low ceiling, it now opens into a lofty volume, gathered under its own vault and lit by daylight the building had always been able to hold.

bottom of page